Structure work – Manor Market area
Flow will be shut off in the Manor Market area starting on Friday 4/15/2016 for repair on control structures. Flow should be back on Monday, 4/18/2016.
Flow will be shut off in the Manor Market area starting on Friday 4/15/2016 for repair on control structures. Flow should be back on Monday, 4/18/2016.